[Q33-Q49] The Best Valid C_TS422_2504 Dumps for Helping Passing C_TS422_2504 Exam!

Share

The Best Valid C_TS422_2504 Dumps for Helping Passing C_TS422_2504 Exam!

UPDATED SAP C_TS422_2504 Exam Questions & Answer

NEW QUESTION # 33
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

  • A. Create an object selection variant for alerts according to the priority of ATP categories
  • B. Assign the overall profile to the authorization profile
  • C. Create an object selection variant for production-planning-related alerts
  • D. Assign the alert profile to the overall profile

Answer: C,D


NEW QUESTION # 34
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

  • A. The MRP run plans the material only if a quotation has been maintained.
  • B. The MRP run starts with external procurement.
  • C. The MRP run starts with in-house production.
  • D. The MRP run does NOT consider the material; it has to be planned interactively.

Answer: C


NEW QUESTION # 35
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.

  • A. It can be used in all SAP S/4HANA Cloud editions.
  • B. Customers can use the dashboard in the dev, test, and production tenants.
  • C. Customers can grant access to the dashboard to partners.
  • D. It can be accessed by using SAP For Me.

Answer: C,D


NEW QUESTION # 36
During production order creation, several valid production versions are found.
How does the system choose the production version?

  • A. Validity period or sales order
  • B. Lot size or material cost
  • C. Alphanumeric or quota arrangement
  • D. Planned order or material number

Answer: C


NEW QUESTION # 37
What is the difference between co-products and by-products?
Note: There are 2 correct answers to this question.

  • A. Only co-products have movement type 101.
  • B. Only co-products appear in the process or production order settlement rule.
  • C. Only co-products have a non-zero inventory valuation.
  • D. Only co-products have movement type 531.

Answer: A,C


NEW QUESTION # 38
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing and bill of material (BOM) must have the same validity period.
  • B. The consistency check must be performed.
  • C. The lot size range must be within the lot size range of the assigned routing.
  • D. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
  • E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.

Answer: B,C,D


NEW QUESTION # 39
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Create without material
  • B. Create by order release
  • C. Convert a purchase requisition
  • D. Create in Kanban process

Answer: A,D


NEW QUESTION # 40
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Order (dispatched) chart
  • B. Order (pool) chart
  • C. Capacity requirements chart
  • D. Work center capacities chart

Answer: C,D


NEW QUESTION # 41
When working with the material status, for which business areas can you set a warning message?
Note: There are 2 correct answers to this question.

  • A. Purchasing
  • B. Sales
  • C. Plant Maintenance
  • D. Classification

Answer: B,C


NEW QUESTION # 42
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

  • A. When several production versions are maintained for one product
  • B. When multiple planned orders are scheduled in parallel on one resource
  • C. When alternative resources are used within one operation
  • D. When several operations are maintained for one product

Answer: C


NEW QUESTION # 43
What are some options for creating a production order?
Note: There are 2 correct answers to this question.

  • A. By partially converting a planned order
  • B. By setting a Kanban container to empty
  • C. By setting a Kanban container to full
  • D. By converting a purchase requisition

Answer: A,B


NEW QUESTION # 44
What is a work center hierarchy?

  • A. A group of work centers in a production line that is used in sequence for production
  • B. A group of alternative work centers for production, structured in hierarchy levels by priorities
  • C. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
  • D. A group of alternative work centers providing a cumulative available capacity for production

Answer: D


NEW QUESTION # 45
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is created.
  • B. MRP creates a planned order.
  • C. MRP creates a dependent requirement.
  • D. A sales order is delivered.

Answer: A


NEW QUESTION # 46
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

  • A. Timeliness
  • B. Efficiency
  • C. Accuracy
  • D. Stability

Answer: B,D


NEW QUESTION # 47
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.

  • A. Setup time
  • B. Queue time
  • C. Float before production
  • D. Transit time
  • E. Load time

Answer: A,B,C


NEW QUESTION # 48
What can you use standard heuristics in Advanced Planning (PP/DS) for?

  • A. To optimize costs and times in production plans
  • B. To set default values in production master data
  • C. To automate material movements in material staging
  • D. To solve planning problems for defined objects

Answer: D


NEW QUESTION # 49
......

Updated C_TS422_2504 Dumps Questions For SAP Exam: https://torrentvce.certkingdompdf.com/C_TS422_2504-latest-certkingdom-dumps.html